Short answer

Re-line a tennis court when the lines are faded, flaking or hard to see from the far baseline, or when moss is lifting their edges. In the UK the best time is late spring to early autumn, on dry days above around 10°C with no rain forecast for several hours. Clean the court first and plan around bookings, because lines need time to cure.

When Should You Re-Line a Tennis Court? Timing and Preparation

Signs your court needs re-lining

Lines rarely fail all at once. The baselines and the service line usually go first because players stand, turn and slide on them. You might see grey patches where paint has worn through, flaking at the edges or lines that look fine up close but disappear from the other end of the court. Line calls then become arguments.

Moss and algae are the other common cause. On shaded courts, green growth creeps along the edges of lines and lifts the paint. Once the edge is loose, water gets under it and more peels away. If you see this, cleaning and re-lining sooner rather than later stops the damage spreading.

  • Lines hard to see from the opposite baseline
  • Paint worn through on baselines or service lines
  • Edges flaking, cracked or lifting
  • Moss or algae growing along or across lines
  • Lines that look out of square or uneven in width

The best time of year in the UK

Acrylic line paint needs a dry surface, mild air temperature and time to cure without rain. In the UK that points to late spring through to early autumn. April and October can work in a settled spell, but short days, cold mornings and heavy dew reduce the working window. Many clubs schedule re-lining just before their main season starts, or in a quiet week in late summer.

On the day, the surface itself must be dry, not just the air. Porous courts hold water after rain and may need several dry hours before painting. Crews also watch the forecast closely. A sharp shower soon after painting can mark or wash fresh lines, so they may postpone at short notice rather than risk a poor finish.

SeasonSuitabilityTypical considerations
Late springGoodReady before the main playing season, watch for showers
SummerBestLongest dry days, plan around peak bookings
Early autumnGoodCooler mornings, falling leaves need clearing
WinterPoorCold, damp surfaces and short days slow curing

How to prepare the court

Good preparation makes new lines last longer. Clear leaves, twigs and loose debris from the surface. Remove benches, ball machines and coaching kit so the crew has the whole court free. If the court has moss or algae, it is worth arranging a proper clean and treatment first, either as a separate visit or on the same day before marking.

Tell the crew about anything unusual, such as lines you know are in the wrong place, recent repairs or areas that hold water. Make sure vehicles can get reasonably close, because paint, tapes and measuring kit are carried to the court. Let members or family know the court is out of use for the day and for a short time afterwards.

What happens on the day

The crew starts by checking the existing lines against the official dimensions. If they are accurate, the old lines are cleaned and masked. If they have drifted, the court is set out again before masking. Tape goes down on both edges of each line, keeping a consistent 50 mm width, then line paint is applied by roller or brush in one or more coats.

Tapes are removed while the paint is still soft so the edges stay sharp. The crew then checks the lines, touches up any bleed and leaves the court to dry. On a single court in good weather, this is normally a one-day job. Courts with multiple sports or colours can take longer because colours dry before the next set is masked.

Planning re-lining around your court's use

For clubs, the timing of re-lining is as much about bookings as weather. Look at the fixtures calendar and choose a date with a few days either side in case the weather forces a change. Coaching programmes, league matches and school use all need to be considered. If you have several courts, re-lining them in sequence keeps some courts open throughout.

Private court owners have more flexibility but still benefit from planning. Combine re-lining with any cleaning, repairs or net replacement so the court is out of use only once. If you are thinking about a colour coating within the next year or two, it can make sense to wait and re-line as part of that work, rather than paying for lines that will be covered.

After the lines are painted

Keep people and equipment off fresh lines until they are touch dry and the crew says the court can be used. Light use is often fine later the same day or the next morning in warm weather, but cooler conditions slow curing. Avoid dragging nets, rollers or heavy kit across new lines for the first few days.

Regular brushing and occasional cleaning help lines last. Keep overhanging trees trimmed so leaves do not sit on the court, and deal with moss early. Lines usually outlast the cleaning effort many times over, so a little maintenance protects the money spent on marking.

Keep a simple record of when the court was last re-lined, cleaned and treated. It makes planning the next visit easier and helps a club committee budget for maintenance rather than reacting when lines become unplayable.

Questions people also ask

How long after line marking can we play?

In warm, dry weather, lines are often touch dry within a few hours and the court can usually be used later that day or the next morning. In cooler or damp conditions, allow longer. The crew will advise on the day, based on the paint used and the temperature when it was applied.

Can a court be re-lined in winter?

It is rarely a good idea. Cold, damp surfaces stop acrylic line paint curing properly, and short daylight hours limit the working window. Paint applied in poor conditions can wear or lift early. Unless the court must be used urgently, wait for a settled spell in spring.

Should the court be cleaned before re-lining?

Yes. Line paint needs a clean, sound surface to bond. The lines themselves are cleaned as part of a re-line, but courts with moss, algae or a green film benefit from a full clean and treatment first, priced at £400–£900 per court. It gives the new lines a much longer life.

Written and checked by the Tennis Court Line Marking team. Read our editorial policy.

Get a free tennis court line marking quote

Tell us what you need and we'll come back with a clear price.

Request a quote