Guide · Homeowners and clubs · 4 min read · Updated 17 November 2026
DIY or Professional Tennis Court Line Marking?
Short answer
DIY line marking can work for touching up short worn sections on a private court if the existing lines are accurate. Full re-lining or setting out a new court is best left to a professional, because squaring, masking and choosing compatible paint take skill and kit. A professional re-line costs £450–£850 per court, and new setting out costs £650–£1,100.
What DIY line marking involves
Painting lines looks simple, but the finish depends on preparation and masking. You need to clean the lines thoroughly, remove moss and loose material, let the surface dry, then mask both edges of every line with tape that sticks firmly to the court. The paint must be suitable for your surface. Ordinary masonry or road paint can be slippery, crack or fail to bond on acrylic or porous courts.
A full court has over 140 metres of lines once singles, doubles, service and centre lines are counted. Masking both edges means laying roughly double that length of tape, keeping a straight edge throughout. Most homeowners underestimate the time and the amount of kneeling involved.
- Stiff brushes or a pressure washer for cleaning
- Long tape measure, string lines and pins
- Quality masking tape designed for outdoor surfaces
- Line paint compatible with the court surface
- Rollers or brushes sized for 50 mm lines
Where DIY tends to go wrong
The most common problem is accuracy. If you set out a court from scratch and it is a few centimetres out of square, the error shows clearly once lines are painted. Checking diagonals with a long tape needs two people and patience. Old courts also drift over years of repainting, so following faded lines can keep repeating an existing mistake.
The second problem is paint bleeding under tape on porous or textured surfaces. That leaves fuzzy edges that look worse than the worn lines did. Painting in the wrong weather causes early failure, and the wrong paint can make lines slippery when wet. Correcting a poor job usually means painting over it in the court colour and starting again.
Comparing the options
The right choice depends on what needs doing and how the court is used. A family court that needs a short section of baseline touched up is a reasonable DIY job. A club court used for matches, a court that needs setting out, or a multi-sport surface is a different matter, because accuracy and finish affect play and appearance.
| Job | DIY realistic? | Professional guide price |
|---|---|---|
| Touch up a short worn section | Yes, with care | Usually done as part of a re-line |
| Full re-line, accurate existing lines | Possible but slow | £450–£850 |
| Setting out a new or resurfaced court | Not recommended | £650–£1,100 |
| Adding pickleball lines | Difficult | £400–£900 |
| Multi-sport MUGA lines | Not recommended | £900–£2,000 |
What a professional brings
A specialist line marker brings the right paint for your surface, proper masking tape and the experience to set out a court quickly and accurately. They know the ITF dimensions, how to measure to the outside edge of lines and how to check squareness. They also judge whether the surface is ready, and will tell you if cleaning or repair is needed before painting.
Speed is a real factor for clubs. A crew can usually re-line a court in a day, so the court is back in use quickly. For multi-court sites, doing all courts in one visit keeps them consistent in colour and width, which looks tidier and avoids arguments over which court is correct.
Costs of getting DIY wrong
It is worth thinking about what happens if a DIY job does not work out. If lines are painted in the wrong place, they cannot simply be removed. They are usually painted over in a colour that matches the surface, then the correct lines are set out and painted. On a faded court, the patch of new surface colour often stands out, so a larger area may need recolouring to look right.
Paint that fails early is another cost. Lines laid on a damp or dirty surface may look good for a few weeks, then flake. The flakes then need scraping off before a professional can re-line, which adds labour. For a club court, there is also the cost of lost playing time while lines are corrected. Weigh those risks against the saving before starting.
If you decide on DIY, do a small test area first. Check how the tape behaves on your surface, how the paint covers and how the edge looks after the tape is removed. That small trial will tell you more than any instructions and can save a full court of poor results.
Making the decision
If your lines are accurate and only lightly worn, and you have time and patience, DIY touch-ups can tide a private court over for a season or two. If the court is used by a club, school or paying customers, or if any setting out is needed, the cost of a professional re-line is small compared with the risk of an inaccurate or short-lived DIY job.
Whichever route you take, start with a clean, dry surface and choose dry, mild weather. If you would like a professional price, send photos and tell us which lines you need. We confirm one fixed price before booking.
Tell us whether the court is private, club or school use, and whether any lines have been moved or repainted before. That helps us judge setting out time and give an accurate figure first time.
Questions people also ask
What paint is used for tennis court lines?
Specialist acrylic line paint is normal on hard courts, chosen to bond with the surface and stay reasonably slip resistant when wet. Some systems use polyurethane-based line paints. Ordinary masonry or road marking paint is not designed for tennis surfaces and can crack, peel or become slippery, so check compatibility before buying.
Can I follow the old lines when re-lining my court?
You can if they are accurate. Before painting, measure the court and check both diagonals are equal. A doubles court diagonal should be about 26.18 m. If the old lines are out, following them repeats the mistake, and setting out the court again is the better option.
Is it cheaper to mark lines myself?
Materials for a single court cost less than a professional re-line, but you also need tools, two people and a full day or more of work in suitable weather. If the result is inaccurate or fails early, the cost of correcting it can exceed the original saving. For small touch-ups, DIY can be worthwhile.
Written and checked by the Tennis Court Line Marking team. Read our editorial policy.
More guides
How Much Does Tennis Court Line Marking Cost in the UK?
Re-lining a single tennis court in the UK costs £450–£850 on a sound surface. Setting out and painting lines on a new or resurfaced court costs…
Tennis Court Dimensions and Line Markings Explained
Under the ITF Rules of Tennis, a court is 23.77 m long, 10.97 m wide for doubles and 8.23 m wide for singles. The service lines sit 6.40 m from the…
Adding Pickleball Lines to a Tennis Court: A UK Guide
A pickleball court measures 6.10 m by 13.41 m including lines, with a 2.13 m non-volley zone each side of the net. One tennis court can usually take…
When Should You Re-Line a Tennis Court? Timing and Preparation
Re-line a tennis court when the lines are faded, flaking or hard to see from the far baseline, or when moss is lifting their edges. In the UK the…
Get a free tennis court line marking quote
Tell us what you need and we'll come back with a clear price.
Request a quote