Tennis Court Line Marking

Tennis Court Line Marking

New Court Line Setting Out

Full setting out of tennis lines on new or resurfaced courts, measured from scratch to official dimensions and squared accurately.

Free Tennis Court Line Marking quote

No obligation. We only use your details to reply about this job.

New Court Line Setting Out — Tennis Court Line Marking

What's involved

New courts and resurfaced courts need lines set out from scratch. The specialist establishes the centre of the net line, then measures out the baselines, sidelines and service lines using steel tapes, string lines and the 3-4-5 method or diagonal checks to make sure everything is square. A doubles court measures 23.77 m by 10.97 m, the singles court 23.77 m by 8.23 m, and the service lines sit 6.40 m from the net. Lines must be between 25 mm and 50 mm wide, except the baseline, which can be up to 100 mm, and every measurement is taken to the outside edge of the lines. The centre mark and centre service line are added, along with net post sockets if needed. Setting out a single court typically takes two to three hours before painting starts. New macadam usually needs to weather before line painting, so follow the contractor's advice on timing.

How we handle it

  1. Assessment

    The specialist reviews photos or visits the court to check the surface type, condition of existing lines, any drift out of square and whether cleaning or repairs are needed first.

  2. Quote and layout

    You receive a quote and, for multi-sport or pickleball work, a layout showing line positions and colours. They confirm the paint system to match your surface.

  3. Cleaning and preparation

    The court is cleaned of moss, algae and debris, and old flaking paint is removed. The surface must then dry fully before lines are set out.

  4. Setting out and painting

    Lines are measured, squared and masked with tape, then painted by roller or brush. Tape is removed carefully for clean edges, and measurements are rechecked.

  5. Drying and handover

    The court is left to dry, usually for several hours to a day depending on paint and weather. The specialist checks lines with you and advises when play can resume.

Price guide

Tennis court line marking is usually priced per court, with extra for cleaning, multi-sport lines and colour coating. Re-lining on existing positions costs less than setting out new lines. Weather affects scheduling, so specialists prefer spring to early autumn. The guide prices below reflect typical UK costs for 2026.

  • Re-line a single tennis court: £450–£850. Cleaning the lines, masking and painting existing tennis lines on a sound surface.
  • Colour coating and new lines: £3,500–£7,000 per court. Acrylic colour coating with fresh lines on a structurally sound surface.
  • Court cleaning and moss treatment: £400–£900 per court. Rotary cleaning or jetting plus treatment, depending on surface and condition.

Questions about new court line setting out

How much does it cost to re-line a tennis court?

Re-lining a single tennis court typically costs £450 to £850 in the UK in 2026. Full setting out on a new or resurfaced court costs around £650 to £1,100. Cleaning, multi-sport lines and colour coating add to the price, and multiple courts on one site reduce the cost per court.

What are the dimensions of a tennis court?

A doubles tennis court is 23.77 m long and 10.97 m wide, and the singles court is 8.23 m wide. The service lines are 6.40 m from the net on each side. Recommended run-back and side run-off space adds several metres to the total area needed.

How wide are tennis court lines?

Under the ITF Rules of Tennis, lines must be between 25 mm and 50 mm wide, except the baseline, which can be up to 100 mm. The centre service line is 50 mm wide. All measurements are taken to the outside edge of the lines.

Get a free tennis court line marking quote

Tell us what you need and we'll come back with a clear price.

Request a quote