Tennis Court Line Marking

Tennis Court Line Marking

Tennis Court Re-Lining

Re-paint worn or faded lines on an existing court, following the original positions or correcting lines that have drifted out of square.

Free Tennis Court Line Marking quote

No obligation. We only use your details to reply about this job.

Tennis Court Re-Lining — Tennis Court Line Marking

What's involved

Re-lining is the most common job on established courts. The specialist cleans the court, removing moss, algae and debris from the lines so the new paint bonds. They then check the existing lines for accuracy by measuring diagonals, as old lines sometimes drift or were set out incorrectly. Where the lines are correct, they are masked with tape along both edges, giving a sharp edge, and the line paint is applied by roller or brush in one or two coats. On porous macadam, a paint that keeps the surface free-draining is used, while acrylic courts need a compatible acrylic line paint. Tape is removed while the paint is still slightly wet for the cleanest edge. A single court usually takes most of a day, depending on weather. The court must be dry and free of frost, and play stopped until the paint has fully dried.

How we handle it

  1. Assessment

    The specialist reviews photos or visits the court to check the surface type, condition of existing lines, any drift out of square and whether cleaning or repairs are needed first.

  2. Quote and layout

    You receive a quote and, for multi-sport or pickleball work, a layout showing line positions and colours. They confirm the paint system to match your surface.

  3. Cleaning and preparation

    The court is cleaned of moss, algae and debris, and old flaking paint is removed. The surface must then dry fully before lines are set out.

  4. Setting out and painting

    Lines are measured, squared and masked with tape, then painted by roller or brush. Tape is removed carefully for clean edges, and measurements are rechecked.

  5. Drying and handover

    The court is left to dry, usually for several hours to a day depending on paint and weather. The specialist checks lines with you and advises when play can resume.

Price guide

Tennis court line marking is usually priced per court, with extra for cleaning, multi-sport lines and colour coating. Re-lining on existing positions costs less than setting out new lines. Weather affects scheduling, so specialists prefer spring to early autumn. The guide prices below reflect typical UK costs for 2026.

  • New court line setting out and painting: £650–£1,100. Full measurement, squaring and painting on a new or resurfaced court.
  • Re-line a single tennis court: £450–£850. Cleaning the lines, masking and painting existing tennis lines on a sound surface.
  • Colour coating and new lines: £3,500–£7,000 per court. Acrylic colour coating with fresh lines on a structurally sound surface.

Questions about tennis court re-lining

How much does it cost to re-line a tennis court?

Re-lining a single tennis court typically costs £450 to £850 in the UK in 2026. Full setting out on a new or resurfaced court costs around £650 to £1,100. Cleaning, multi-sport lines and colour coating add to the price, and multiple courts on one site reduce the cost per court.

What are the dimensions of a tennis court?

A doubles tennis court is 23.77 m long and 10.97 m wide, and the singles court is 8.23 m wide. The service lines are 6.40 m from the net on each side. Recommended run-back and side run-off space adds several metres to the total area needed.

How wide are tennis court lines?

Under the ITF Rules of Tennis, lines must be between 25 mm and 50 mm wide, except the baseline, which can be up to 100 mm. The centre service line is 50 mm wide. All measurements are taken to the outside edge of the lines.

Get a free tennis court line marking quote

Tell us what you need and we'll come back with a clear price.

Request a quote