Tennis Court Line Marking

Guide · Clubs and schools · 4 min read · Updated 17 November 2026

How Much Does Tennis Court Line Marking Cost in the UK?

Short answer

Re-lining a single tennis court in the UK costs £450–£850 on a sound surface. Setting out and painting lines on a new or resurfaced court costs £650–£1,100. Adding pickleball lines costs £400–£900, full multi-sport lines on a MUGA cost £900–£2,000, cleaning and moss treatment costs £400–£900 per court, and a colour coating with new lines costs £3,500–£7,000 per court.

How Much Does Tennis Court Line Marking Cost in the UK?

Typical tennis court line marking prices in 2026

Line marking is priced per court, then adjusted for the condition of the surface, the number of line colours and how much setting out is needed. Re-painting existing lines that are still in the right place is the quickest job. Measuring a court from scratch, squaring it and painting every line takes longer because the crew has to check diagonals and string lines before any paint goes down.

The figures below are guide prices for a standard full-size court with reasonable access. We give one fixed price per job after seeing photos of the court and knowing what lines you want.

JobGuide priceWhat it usually covers
Re-line a single tennis court£450–£850Cleaning the lines, masking and painting existing tennis lines
New court line setting out and painting£650–£1,100Full measurement, squaring and painting on a new or resurfaced court
Pickleball lines on a tennis court£400–£900One to four pickleball courts in a contrasting colour
Multi-sport court lines£900–£2,000Tennis, netball, basketball and mini tennis lines on a MUGA
Court cleaning and moss treatment£400–£900 per courtRotary cleaning or jetting plus treatment
Colour coating and new lines£3,500–£7,000 per courtAcrylic colour coating with fresh lines on a sound surface

What pushes the price up or down

The biggest single factor is surface condition. Paint only bonds to a clean, dry, sound surface. If the lines are covered in moss, algae or a green film, they need scrubbing or jetting first, and badly contaminated courts may need a full clean before marking makes sense. Loose aggregate on an old porous macadam court can also mean extra preparation, because paint laid over a crumbling edge simply lifts with it.

The second factor is complexity. Each extra sport adds measuring, masking and a separate colour, and each colour has to dry before overlapping lines are taped. A school MUGA with tennis, netball, basketball and five-a-side lines can take two or three times as long as a single tennis court. Multiple courts on one site usually cost less per court, because set-up and travel are shared.

  • Number of courts being marked on the same visit
  • Whether existing lines can be followed or the court needs setting out from scratch
  • Number of line colours and overlapping sports
  • Amount of cleaning and moss removal needed first
  • Access for vehicles and equipment to the court

Re-lining versus a full colour coating

Re-lining refreshes the white lines and leaves the playing surface as it is. It suits courts where the colour is still acceptable and the lines have simply worn at the baseline and service line, which take most foot traffic. On busy club courts, lines often wear noticeably within a few seasons, while the surface colour lasts longer.

A colour coating is a different job. Layers of acrylic coating are applied across the whole court, then new lines are painted on top. It costs far more, but it changes the look and feel of the court and can tidy up patchy, faded or stained surfaces. It only works on a structurally sound base. If the court has cracks, depressions that hold water or failing edges, those need repair or resurfacing before coating.

How long the work takes

A straightforward re-line of one court is usually a one-day job, subject to the weather. The crew cleans the old lines, masks both edges of each line with tape, applies the paint and removes the tape before the paint fully cures, so the edge stays crisp. Setting out a new court adds time because the lines are measured and checked before masking starts.

Acrylic line paint needs a dry surface and mild temperatures to cure properly. Most crews avoid painting when rain is forecast within a few hours, when the court is still damp from overnight dew, or when it is cold. That is why line marking in the UK is concentrated between spring and early autumn, and why dates can move if the forecast changes.

Multi-court sites and multi-sport surfaces

Clubs, schools and parks often have a bank of courts side by side. Marking them in one visit saves time and money because the crew sets up once, carries kit once and works through the courts in order. It also keeps line widths, colours and finish consistent across every court, which matters when players move between courts in a match or tournament.

Multi-sport surfaces need more planning. Each sport has its own dimensions and conventions, and some lines overlap or run very close together. A good layout puts the main sport in white and gives every other sport a distinct colour, so players can follow their own lines. Before pricing, agree which sports are needed and which take priority, because that decides where compromises are made when space is tight. Changing the plan halfway through a job adds masking and drying time.

  • List every sport you want marked, in order of priority
  • Note any lines that must stay in their current position
  • Say whether you want existing faded lines blacked out or recoloured

Getting an accurate quote

You can speed up pricing by sending clear information up front. A few photos taken from each corner of the court, plus close-ups of the worst lines, show the surface type and the level of wear. Tell us whether you want tennis only or extra sports, and whether any lines are known to be in the wrong place.

We then confirm one all-in price for the job. It covers labour, line paint, masking materials and the cleaning described in the quote, so there are no surprises on the day. If the surface turns out to need repair before marking, we tell you before any work starts rather than painting over a problem.

  • Photos from each corner and close-ups of worn lines
  • Surface type if known: porous macadam, acrylic, polymeric or artificial grass
  • Sports you want marked and any preferred colours
  • Vehicle access route and the nearest parking point

Questions people also ask

How often does a tennis court need re-lining?

It depends on use and surface. A busy club or school court often needs its lines refreshed every two to four years, with the baselines wearing first. A lightly used private court can go longer. Keeping the court clean and free of moss helps paint last, because organic growth lifts the edges of the lines.

Can you paint lines on an artificial grass tennis court?

Sand-filled artificial grass courts normally have lines that are cut into the carpet or tufted in during manufacture, rather than painted. Repairs usually involve cutting in new line strips. Paint is suited to hard courts such as porous macadam, acrylic-coated courts and some polymeric surfaces, so check the surface type before asking for a paint-only re-line.

Is cleaning included in the line marking price?

Basic cleaning of the lines to be painted is included in a re-lining price. A full court clean with moss and algae treatment is a separate job, priced at £400–£900 per court. If the court is heavily contaminated, a full clean first gives the new lines a much better chance of bonding and lasting.

Written and checked by the Tennis Court Line Marking team. Read our editorial policy.

Get a free tennis court line marking quote

Tell us what you need and we'll come back with a clear price.

Request a quote